Hondros College of Nursing

Third and Fourth floor remodel

7th

Campus Location

15,000

Square Feet

2021

Year of Completion

PROJECT TYPE

Renovation

LOCATION

Akron, Ohio

OWNER

American Public Education Inc.,

ARCHITECT

HSB Architects + Engineers

Hondros College of Nursing

Akron Campus

Campus Remodel

Welty Building Company was the construction manager for this 15,000 SF satellite campus remodel for Hondros College of Nursing. The Akron campus is the seventh campus location for Hondros College.

This campus remodel of the third and fourth floor included classrooms, administrative and faculty offices, a student lounge, lab space and testing areas. Chemical resistant counter-tops and cabinets were installed in the labs. The project team delivered the keys 6 days early for the 2 month schedule.

  • Classrooms
  • Administrative and Faculty offices
  • Student lounge
  • Lab space
  • Testing areas

Contact Us

3421 Ridgewood Road, Suite 225
Fairlawn, Ohio 44333

Recent News

11
January
2022 Crain's Power 150 Recognizes Don Taylor
Cleveland Crain’s Crain’s 2022 Power 150 2022 Crain’s Power 150 celebrates and honors some of Ohio’s best and brightest. From CEOs and politicians to philanthropists and entrepreneurs, Crain’s Power 150 is a snapshot of those leading some ...
?>
10
January
Akron History Center to Open in 2024
By:  ERIC POSTON Akron.com Downtown Akron to open Akron History Center Next Year DOWNTOWN AKRON — A dedicated space to tell the history of the City of Akron is expected to open next December. Construction of the Akron ...
?>