Welty was the Construction Manager for the renovation of 17 apartment units that had sustained damage due to a fire. The scope of work included the repair of all affected units, which varied in structure, encompassing both two-level and three-level layouts, with six of those units featuring penthouse decks. The renovation process involved the complete installation of new drywall, followed by taping, sanding, and painting to ensure a fresh and updated appearance. New flooring was laid down to replace any that had been damaged. In the kitchen areas, 15 units underwent complete rebuilds, including the installation of new countertops, cabinetry, and vanities, which revitalized the space with a modern touch. The project also addressed the mechanical, electrical, and plumbing systems—any components that had been damaged were reworked or replaced as necessary to meet current safety and operational standards.