    Floors

    45,000

    Square Feet

    2013

    Year of Completion
    Back to Projects

    Auburn Science and Technology Library

    Project Type: Education, Government, Interiors

    Location: Akron, Ohio

    Owner: The University of Akron

    Architect: Hasenstab Architects, Inc.

    Addition and Renovation to the existing library

    Welty completed a renovation and a new 45,000 SF addition to the existing library in three phases.

    The first phase of the project consisted of concrete restoration to a parking deck under the building where one of the floors was converted into library space. The deck was 172,000 SF and has 580 parking spaces. The deck was kept open during restoration.

    The second phase consisted of the addition to the existing building. The third phase was a renovation of the existing library with the main floor and the second floor of the renovation being phased due to owner occupancy. The library was also kept open during the entire duration of the project.

     